Skip to content

Storm line open 24/7 ·

Menu

/

/

Old Town slate cottage

Job

2291

· Ashford Old Town

Slate restoration

Stone cottage on Mill Row

We kept 70% of the original slate, replaced the rest with reclaimed stone of the same quarry colour, and rebuilt both chimneys with copper flashing.

Material

Natural slate

Size

18 squares

On site

12 days

Completed

May 2026

/

/

Old Town slate cottage

Job

2291

· Ashford Old Town

Slate restoration

Stone cottage on Mill Row

We kept 70% of the original slate, replaced the rest with reclaimed stone of the same quarry colour, and rebuilt both chimneys with copper flashing.

Material

Natural slate

Size

18 squares

On site

12 days

Completed

May 2026

/

/

Old Town slate cottage

Job

2291

· Ashford Old Town

Slate restoration

Stone cottage on Mill Row

We kept 70% of the original slate, replaced the rest with reclaimed stone of the same quarry colour, and rebuilt both chimneys with copper flashing.

Material

Natural slate

Size

18 squares

On site

12 days

Completed

May 2026

(The brief)

Slates had been sliding off this roof for three winters. Two quotes had recommended stripping it and putting asphalt shingle on, which the owners did not want on a stone cottage of this age.

Slates had been sliding off this roof for three winters. Two quotes had recommended stripping it and putting asphalt shingle on, which the owners did not want on a stone cottage of this age.

The slate itself was sound. The iron nails holding it had rusted through, which roofers call nail sickness, and the chimneys had been pointed with mortar instead of flashed.

The slate itself was sound. The iron nails holding it had rusted through, which roofers call nail sickness, and the chimneys had been pointed with mortar instead of flashed.

Job sheet

Job

2291

Address

Mill Row, Ashford Old Town

House

1880s stone cottage, 1½ stories

Foreman

Colm Brennan

Crew

Slate and heritage crew · 4 roofers

Inspection

Thu 2 Apr 2026

(What we found)

48 photos, 3 findings, one plain answer

The report the owners received within 24 hours of the inspection, trimmed to its findings. Every one has a photo reference and a rating.

Replace

Worn out across the area

Repair

A specific fault letting water in

Watch

Not urgent, check again next year

Inspection report

HR-2291 · Mill Row, Ashford Old Town

P-05 Front slope

P-05 Front slope

P-13 Both chimneys

P-13 Both chimneys

P-21 Battens

P-21 Battens

Repair

P-05

Nail sickness: iron nails rusted through, 1 in 5 slates slipped or loose

Replace

P-13

Mortar fillets instead of flashing, cracked and letting water into the chimney breast

Replace

P-21

Original battens soft along the eaves, sagging under the lower courses

48 photos · 3 findings

Inspected by C. Brennan

(Scope and numbers)

The written price, and what it came to

The quote the owners signed, and every change agreed on site, each one photographed before the work was done.

(Scope and numbers)

The written price, and what it came to

The quote the owners signed, and every change agreed on site, each one photographed before the work was done.

(Scope and numbers)

The written price, and what it came to

The quote the owners signed, and every change agreed on site, each one photographed before the work was done.

Written scope

Q-2291 · fixed price

Item

Qty

Price

Scaffold, 12 working days

1

$2,400

Strip, sort and set aside original slate

18 sq

$4,320

Breathable membrane and new treated battens

18 sq

$3,240

Relay slate with copper nails, 3 in headlap

18 sq

$14,040

Reclaimed slate, matched quarry colour

5.4 sq

$6,210

Copper step and cover flashing, 2 chimneys

2

$3,860

Agreed during the build

Sister one cracked rafter at the rear eave (photographed)

1

$420

Fixed price

$34,070

Final invoice

$34,490

Includes permit and disposal

No deposit until materials were delivered

70%

70%

original slate kept

12

12

days on site

6,100

6,100

copper nails

100+

100+

years expected

How it was paid

40% on materials delivery

$13,628

Balance at sign-off

$20,862

(Build log)

Day by day, as the owners saw it

Each entry is the daily text the owners received at the end of the day, with the photos left out.

Build log

Job 2291 · Slate and heritage crew · 4 roofers

Fri 1 May

Scaffold up, reclaimed slate delivered

Slate sorted against the original on the ground

Mon 4 May

Strip front slope, slates sorted and stacked

Sound slate chalk-marked for relaying

Wed 6 May

Front slope membrane and battens

Cracked rafter found and sistered · photo sent

Mon 11 May

Front slope relaid, rear slope stripped

Original slates on the street side, reclaimed at the rear

Thu 14 May

Copper flashing, both chimneys

Stepped into raked-out joints and repointed in lime

Tue 19 May

Ridge, clean-up, scaffold down, sign-off

Walkthrough with the owners 15:00 · warranty W-2291 issued

Daily text at 18:00

Foreman: Colm Brennan

Sign-off photo · May 2026

(The result)

How it turned out

From the lane the roof looks as it did before, which was the point. The street-facing slope is almost entirely original stone, the reclaimed slate is on the rear, and the chimney breasts have dried out for the first time in years. With copper nails and copper flashing, the next job on this roof should be somebody else's in the next century.

25 yr

Workmanship warranty

W-2291 · expires May 2051

(Free inspection)

Want the same paperwork on your roof?

Every job starts with a free inspection. The report reaches you within 24 hours and the fixed price within 48.

(Free inspection)

Want the same paperwork on your roof?

Every job starts with a free inspection. The report reaches you within 24 hours and the fixed price within 48.

(Free inspection)

Want the same paperwork on your roof?

Every job starts with a free inspection. The report reaches you within 24 hours and the fixed price within 48.

Halden

Roofing Co.

Roof replacement, repair, inspections and storm response across the Ashford Valley since 2004.

Office hours Mon–Sat

Service area

Ashford

Millbrook

Fenwick

Kestrel Heights

Orchard Lane

Hours

Mon–Fri 07:00–18:00

Sat 08:00–13:00

Storm line 24/7

© 2026 Halden Roofing Co. All rights reserved.

Halden

Roofing Co.

Roof replacement, repair, inspections and storm response across the Ashford Valley since 2004.

Office hours Mon–Sat

Service area

Ashford

Millbrook

Fenwick

Kestrel Heights

Orchard Lane

Hours

Mon–Fri 07:00–18:00

Sat 08:00–13:00

Storm line 24/7

© 2026 Halden Roofing Co. All rights reserved.

Halden

Roof replacement, repair, inspections and storm response across the Ashford Valley since 2004.

Office hours Mon–Sat

Service area

Ashford

Millbrook

Fenwick

Kestrel Heights

Orchard Lane

Hours

Mon–Fri 07:00–18:00

Sat 08:00–13:00

Storm line 24/7

© 2026 Halden Roofing Co. All rights reserved.

Built by Visuvate

Built by Visuvate

Create a free website with Framer, the website builder loved by startups, designers and agencies.