(The brief)
Job sheet
Job
2318
Address
Alder Street, Fenwick
House
1924 craftsman bungalow, 1½ stories
Foreman
Dee Marsh
Crew
Crew 3 · 6 roofers + gutter crew
Inspection
Wed 13 May 2026
(What we found)
29 photos, 3 findings, one plain answer
The report the owners received within 24 hours of the inspection, trimmed to its findings. Every one has a photo reference and a rating.
Replace
Worn out across the area
Repair
A specific fault letting water in
Watch
Not urgent, check again next year
Inspection report
HR-2318 · Alder Street, Fenwick



Replace
P-06
Shingles laid at 2/12 pitch, water backing up at the house wall
Repair
P-12
Dormer step flashing face-nailed and caulked, sealant split on both sides
Replace
P-18
4 in gutters overflow where both dormer valleys discharge
29 photos · 3 findings
Inspected by R. Halden
Written scope
Q-2318 · fixed price
Item
Qty
Price
Tear-off, 1 layer, disposal
22 sq
$1,980
Architectural shingle system, main roof
19 sq
$5,890
Self-adhered membrane, porch roof
3 sq
$1,560
Dormer step & counter flashing
2 dormers
$980
Ice & water shield, eaves + valleys
6 rolls
$780
6 in seamless gutters and 5 downspouts
136 ft
$2,450
Deck boards, if needed
per sheet
$88
Agreed during the build
Deck sheets replaced at the porch wall
2 × $88
$176
Fixed price
$13,640
Final invoice
$13,816
Includes permit and disposal
No deposit until materials were delivered
squares
days on site
ft of seamless gutter
deck sheets replaced
How it was paid
40% on materials delivery
$5,456
Balance at sign-off
$8,360
(Build log)
Day by day, as the owners saw it
Each entry is the daily text the owners received at the end of the day, with the photos left out.
Build log
Job 2318 · Crew 3 · 6 roofers + gutter crew
Mon 1 Jun
Materials delivered, dumpster placed
Gutter coil colour confirmed: white, to match the trim
Tue 2 Jun
Tear-off, 2 deck sheets replaced at the porch wall
Dry-in complete 17:15
Wed 3 Jun
Shingles on main roof, dormer flashing rebuilt
Step flashing woven in course by course, no sealant
Thu 4 Jun
Porch membrane, gutters, clean-up and sign-off
Gutter crew formed 136 ft on site · warranty W-2318 issued
Daily text at 18:00
Foreman: Dee Marsh

Sign-off photo · Jun 2026
(The result)
How it turned out
The porch now has a membrane made for low slopes, turned 8 inches up the house wall under new counter flashing, and the west wall has stayed dry. The 6-inch gutters take both dormer valleys without overflowing, and the downspouts now discharge 4 feet from the foundation instead of onto the front path.
25 yr
Workmanship warranty
W-2318 · expires Jun 2051



